Step 5: Drop Splicing

The final outdoor step of fiber drop construction is the splicing of the drop. The splice technician connects the last length of fiber at the tap point and mounts a network interface device (NID) at the structure with the final splice being made inside the NID box. The service is now ready to turn over to EMPOWER Broadband for scheduling in-home installation.